Project

Natakhtari Hub

The Natakhtari Hub is one of the largest parking facilities in Georgia, designed specifically for trucks and industrial machinery. The main goal of the project was to create a high-quality, durable and easy-to-maintain surface capable of withstanding intensive daily loads while ensuring safety and efficiency.

Within the project, surface paving was carried out over an area of 52,000 square metres, and the works were completed in 54 days, demonstrating the highest level of operational efficiency and professionalism.

In line with the client’s requirements, the key criteria included: – a solid and durable surface that remains stable under high daily loads; – tiles that are easy to lay and easy to replace in the future, which considerably simplifies operation and maintenance; – a fast-laying technology that significantly reduces the duration of the works.

To fully meet these requirements, the project used the unique Uni Colloc tile, which stands out for its durability and easy installation

The works were carried out using our modern machinery and equipment, which makes it possible to lay more than 1,000 square metres of tiles in a single day, significantly increasing the speed and efficiency of the works.

The Natakhtari Hub is not only a functional but also a technologically advanced project, ensuring high quality and maximum convenience for future maintenance.

Photos